Refurbishment – Reception area case study

Reception-area-refurbishment

Reception Area Refurbishment Case StudyModernise reception including breakout area Engineering New Malden 4 weeks BRIEF The client asked us to strip out and modernise their reception area, including all new mechanical, a new TV mount for internal advertising and a breakout work area for staff to have informal meetings, whilst retaining their existing bespoke reception […]

Full turnkey CATB fit-out

Full-turnkey-CATB-fit-out-feature

Full turnkey CATB fit-outCommercial office space and warehouse Distribution Chessington 8 weeks BRIEF Creed-Miles were tasked by our client, Volante, with carrying out a full turnkey CATB fit-out of their new office space and warehouse area. We had 9 weeks in which to finish the job which included relocating their old premises over to their […]

Shop Front Refurbishment – Case Study

Retail-shop-refurbishment-front-feature

Retail Shop Refurbishment Case StudyRepair and repaint front of shop Retail Dulwich 2 weeks BRIEF The client asked us to strip and repaint the front of their Dulwich store. THE SOLUTION Strip existing paint and all rotten timber to the shop front. To rebuild the existing shop front where required using new marine plywood. Weatherproofing […]

Refurbishment Toilet Block Case Study

Toilet-block-refurb-Feature-sq-v2

Toliet Block Refurbishment Case StudyFresh modern design and replacement of existing washrooms Engineering Leatherhead 4 weeks BRIEF The client approached Creed-Miles to refurbish all the WC’s at their large office complex, as they had not been done for a number of years and were looking tired as well as dated. They wanted us to give […]

Refurbishment Case Study – Outdoor Terrace Area

Roof-terrace-transformation

Refurbishment Case StudyTransforming a rooftop terrace into an amazing outdoor space Publishing / Media Twickenham 4 Weeks BRIEF The client wanted to transform a usable outdoor area into a safe, attractive outside space to be used by staff to work and relax. We were tasked with turning the dis-used terrace space into a usable breakout […]

Small Retail Fit-Out Case Study – Travel Agent

Travel-Agent-Refurbishment-feature

Small Retail Refurbishment Case StudyWork with supplied Architectural plans and replicate what was required on paper into reality retail Kingston 20 days BRIEF To complete a full strip out of existing tenants fixtures and fittings along with all electrical items. To replicate the Corporate image/branding of all other national stores. To complete all works with […]

Office Refurbishment Case Study – Contemporary Office Space

Office-Refurbishment-contemporary-office-space-feature

Office Refurbishment Case StudyLight and contemporary office space Office Crawley 4 Weeks BRIEF The client had outgrown their existing regional office and required a new light and contemporary office space.    They required an open plan space with the inclusion of a large meeting room, a One on One meeting room, a One on One […]

Refurbishment Case Study – Retail Unit

retail-shop-refurbishment-shopfront-feature

Retail Refurbishment Case StudyCreate a light, bright, spacious retail space within a very strict 4 weeks period retail Ilford 4 Weeks BRIEF To interpret concept plans from the clients chosen designer and bring to life an old dark and dingy restaurant space into a light, bright, spacious retail space within a very strict 4 weeks period. […]

Refurbishment Case Study – Open Plan Office

Office-Refurbishment-Open-Plan-Office-feature

Office Refurbishment Case StudyDilapidate all installations from outgoing tenant and replicate previously supplied design and feel open office Surbiton-london 7 weeks BRIEF To dilapidate all installations from outgoing tenant to floor space of 47,500 square foot and replicate design and feel to what we had previously supplied and installed to the 4 other floors in […]

Refurbishment Case Study – Accommodation

Accommodation-refurbishment-case-study-feature

Accommodation Refurbishment Case StudyRefurbish an existing home to accommodate the change in use Healthcare Redhill – Surrey 3 weeks BRIEF The client wanted to refurbish an existing home to accommodate the change in use. We needed to make all the areas safe for the change of use and new admissions, but at the same time […]